Living room at dusk with warm lamp light

THRESHOLD

Lighting and control. London and the Home Counties.

Private house, Highbury. 2026.

Start a project

001/ The idea

A good smart home is one nobody in the house notices. The lights come up at the right level when you walk in, the heating knows the difference between a Tuesday and a Sunday, and nothing requires a phone. We design the control layer alongside your architect and electrician, before the walls close, which is the only time it is cheap to do properly.

The evening scene

06 rooms / 22 s

  1. 01 Hall
  2. 02 Kitchen
  3. 03 Dining
  4. 04 Living
  5. 05 Landing
  6. 06 Bathroom

The evening scene at a house in Highbury. Six rooms, one press, 22 seconds from hall to landing.

002/ What we install

  • Lighting control.

    6 to 25K GBP

    Dimming, scenes and keypads that replace the wall of switches. The part that changes how a house feels.

  • Heating and shading.

    4 to 15K GBP

    Zoned heating, blinds and curtains, set up so they behave without being asked.

  • Audio.

    3 to 20K GBP

    Ceiling speakers where they belong, and nowhere they do not.

  • Networks and security.

    3 to 12K GBP

    Wired where possible, cameras and door entry that keep working when the internet does not.

004/ Stages

How we work with your architect.

  1. 01 / Stage 2

    Concept.

    We join the first design meeting and mark up the drawings before anything is priced.

  2. 02 / Stage 4

    Technical design.

    Cable routes, keypad positions and a schedule your electrician can actually build from.

  3. 03 / Stage 5

    First fix.

    We supervise the cabling on site. This is the stage that decides whether the rest goes well.

  4. 04 / Stage 5

    Second fix and programming.

    Keypads on, scenes set, then a week of living with it before we adjust.

  5. 05 / Handover

    Handover.

    A printed plan, every password, and a two hour walk through with whoever runs the house.

005/ Honest

What we do not do.

  • 01No proprietary apps you cannot hand to the next owner.
  • 02No monthly subscriptions for your own lights.
  • 03No voice assistants unless you ask for them.
  • 04No retrofit promises we cannot keep once we have seen the floors.
  • 05No work without a main contractor or electrician on site.
“They moved three keypads at first fix because of where we actually stood in the room. Nobody else would have noticed.”
Ellen Vaughan, architect, Highbury project

The best time to call us is before the plaster.

Current lead time for design work: four weeks.